A transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end
... [Show More] load is suddenly increased, the voltage phase angle difference will be?
The phase angle will increase. When load is increased phase angle will increase.
A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW draw?
90 pf= mw/mva
The high side of a delta-wye connection transformer is connected to a power system with 199 kV L-G high side voltage. What is the voltage across the delta winding of the transformer?
Vl-l= square root of 3 times Vl-g 1.73x191= 345kV
If a transmission line is carrying 400 MW and 300 MVAR what is the MVA?
3-4-5 triangle 500 MVA
The prime mover is the component of the generator that creates the rotational force. In a typical coal fired steam generator what component spins the rotor?
Turbine
Reactive reserve response during a disturbance is best obtained from which devise?
Synchronous condensers
For two identically constructed transmission lines where Line A is 150 miles long and line B is 15 miles long, if both lines are lightly loaded?
A produces more reactive power than B.
Lightly loaded transmission lines essentially behave like?
Shunt Capacitors
You receive an alarm that indicates low oil pressure on an underground transmission cable. SCADA shows the pressure is continuing to drop. What is the first step you take to protect the line?
Isolate the line
Computer simulations show that for a 100 MW schedule from Bus A to Bus B, 63% of the schedule will flow on the scheduled path and the remainder will flow on other parallel paths. What is the distribution factor for the scheduled path?
63%
Which statement best describes how reactive power MVAR power normally flows?
High Voltage to Low Voltage
Which of the following types of data are BA and RC not required to share with one another?
Generator start up cost
TOP must develop, maintain, and implement formal policies and procedures to provide for transmission reliability. Which of the following DOES NOT need to be addressed in these policies and procedures?
Planned outages of generation units
A 1000 MVA rated generator that produces 800 MW and 100 MVAR is best described as?
Operating in a lagging mode. Inductive system
Which of the following types of MW load is the most impacted by an intentional frequency reduction?
Motor
Assume there are two 250 mile long transmission lines exporting an excessive amount of MW from a generation area to a load area. One of the lines suddenly trips and the area power system collapses within a few seconds. The most likely cause of the collapse?
Angle Instability
The phase voltage in a wye-connected load is 277 V. What is the line to line voltage?
480 V
A simple power system is composed of three lines connecting generation to load. Each lines the same impedance, is initially loaded at 200 MW, and has a thermal limit of 400 MW. If one line trips, what the loading on the shortest remaining line be and will the thermal limit either remaining line be violated?
300 MW and No
The best prediction of system load is the load forecast tool that uses?
Forecasted Weather
If the phase angel at an open breaker is equal to 1/10 of a cycle, this is the the same angle as?
1/10 of 360 so 36
A ___________ tool is used to ensure the power system can respond within acceptable limits of N-1
Contingency Analysis
Which of the following activities would not be included in the procedures for transmission reliability?
Ancillary service pricing
The transmission Operator and BA shall provide documentation that operating personnel have ______ to implement real time actions to ensure the stable and reliable operation of the BES.
Proper NERC Certification Credential
A utility distribution bus has the following customer loads attached. What is the total customer MW load and is the total customer load capacitive or inductive? 5 MW 1 MVAR & 3 MW 1 MVAR & 2 MW -2 MVAR & 10 MW 3 MVAR
20 mw and Inductive
How many MVARs does a 230 kV, 50 MVAR capacitor bank provide when the voltage id 207 kV
Actual MW/ Rated MW ^2 x Capacitor Rating
40
You are a system operator and the load forecast is for an all time summer peak load day, generations and reactive resources will be tight. Which scheduled job would you allow to proceed?
735 kV shunt reactor maintenance.
A contingency results in the exceedance of an IROL. What could be the result if the IROL is allowed to be exceeded longer than T sub v
Interruption of power to a large part of the BES
Generators have the ability to be used as voltage control devices. If a generator raises its VAR output, the system orator should expect system stage to?
Increase
The actual voltage is 362kV on a 345 bus. What is the p.u. voltage?
1.05
In the initial stages of a system restoration condition high transmission system voltage problems are more likely than low transmission system voltage problems why?
Because of excessive MVAR supply from the energization of transmission lines
All transmission operators shall operate so that instability uncontrolled separation or cascading outages will not occur in result of?
Most severe single contingency MSSC
A 230kV transmission line is energized at 230kV and is 100 miles long. What is the approximate line charging contribution?
30MVAR
When the system is on the verge of a voltage collapse and nothing else can be done to alleviate the problem, operating personnel should?
Shed Load
The transmission operator shall take corrective actions necessary to prevent voltage collapse when reactive resources are insufficient including?
Shedding Load
There is a SPS/RAS system out of service for maintenance in your BA. What actions do you take?
Operate within system limits that the SPS/RAS is designed to protect against
If a BA has 500 MW of spinning Reserves and of that 300 MW are Regulating Reserves by definition NERC requires the Regulating Reserves must be?
On line and AGC responsive
What is the approximate MVAR/Mile production for a 345kV line?
3/4
The MSSC for your BA Area is 850 MW. A defined disturbance for DCS reporting would be qual to how many MWs?
680
Of the following which would be the best indicator of voltage collapse prone conditions?
Low reactive power reserves
If the phase angle add an open breaker is equal to 1/10 of a cycle this is the same as an angle of _____________degrees
36
A__________Tool is used to ensure the power system can respond within acceptable limits N-1conditions?
Contingency analysis
Transmission operator and balancing authority shall provide documentation that operation personnel have the_____________ to implement real-time actions to ensure the stable and reliable operation of the bulk electric system.
Proper NERC certification credential
How many MVAR does a 230 kV, 50 MVAR capacitor bank provide when the voltage is 207 kV?
40 MVAR
You are a system operator in the load forecast is for an all time summer peek load day, generation and reactive resources will be tight which scheduled job would you allow to proceed?
735 kV Shunt reactor maintenance
A contingency results in the accidents of a IROL.What could be the result if the IROL is allowed to be exceeded longer than its Tv?
Interruption of power to a large part of the BES
Generators have the ability to be used as voltage control devices. If a generator raises its VAR output, the system operator should expect this system voltage to?
Increase
The actual voltage is 362 kV on a 345 caliber bus. What is the p.u. voltage?
Actual/nominal x 100. 1.05
In the initial stages of a system restoration condition, high tansmission system voltage problems are more likely than low transmission system voltage problems. Why?
Because of excessive MVAR Supply from the energization of transmission lines
Reactive resources are used to?
Maintain acceptable voltage levels
All TOP shall operate so that instability, uncontrolled separation, or cascading outages will not occur as a result of the?
Most severe single contingency N-1
A 230 kV transmission line is energized at 230 kV and is 100 miles long what is the approximate line charging contribution of this transmission line?
30 MVAR 230 kV= 1/3 MVAR per mile
When a system is on the verge of a voltage collapse and nothing else can be done to alleviate the problem Operating personnel should?
Shed load
The TOP shall take corrective actions necessary to prevent voltage Collabs when reactive resources are insufficient including
Shedding firm load
There is a SPS/RAS system out of service for maintenance and you're balancing area what actions do you take?
Operate within the system limits that the SPS/RAS is designed to protect against
A bus with a closed breaker and then open end breaker. Draw a line of the voltage profile
Close to open Voltage profile will increase when getting closer to the open breaker
If a balancing authority has a 500 MW spinning reserves and of that, 300 MW are regulating reserves by definition NERC requires the regulating reserves must be?
Online, and automatic generation control AGC responsive
What is the approximate and the MVAR/Mile For a 345 kV overhead line?
3/4 or 1
The most severe single contingency for your balancing authority area is 850 MW.A defined disturbance for DCS reporting would be equal to how many MW?
Most severe single contingency is computed using 80% of given MW 680MW
A simple power system is composed of three transmission lines that connect the generation area to the load area. Three transmission lines are the same length but each line has a different impedance. Line 1 is 30 ohms, line 2 is 40 ohms , and line 3 at 60 ohms. The operating security limit of each line is 500 MW. If 1000 MW is flowing from generation to load what will the flow be online number two if the line 1 trips? Or line to violate its operating security limit?
Yes, 600 MW
Of the following, which would be the best indicator for voltage collapse prone conditions?
Low reactive power reserves
Pseudo-Tie is entered into what proportion of the balancing authorities tie line bias ACE equation
Actual interchange
The initial interconnection time error is zero seconds. The interconnection then experiences four hours of 60.02 hurts and then three hours of 59.98 Hz frequency. What is the accumulated time error?
1.2 seconds per hour, Over frequency is a positive value so 1.2×4 = 4.8, under frequency is a negative value 1.2×3 = -3.6
NERC requires that all BAs Carrie sufficient operating reserves to ensure adequate a GC and to ensure response to contingencies operating reserves can be provided from which of the following resources
Interruptible load
BA A is importing 225 MW and it's only scheduled to import 200 MW the balancing authorities Beta is 200 MW/ 0.1 Hz and frequency is 59.99 hurts what does ace indicate
45 MW under generating
The value such as MW, MVAR, amperes, frequency of volts That satisfies the most limiting of prescribed operating criteria for a specified system configuration to ensure operation within acceptable reliability criteria is called
System operating limit (SOL)
A transmission line loaded above it surge impedance loading (SIL) is a
Net user of MVAR From the system
Regardless of the process that uses, the reliability coordinator must direct it's balancing authorities and transmission operators to return the transmission system to within it's a IROL as soon as possible, but no longer than?
30 min
Relay station for microwave telecommunication system is solely dependent on a local AC power system source. What would be the disadvantage of such an arrangement?
The relay station is lost if the AC power is lost the system has no back up
When can a transmission operator disconnect from the Interconnection?
When equipment is endangered
The basic uses of transformers include all the following except?
Generating a voltage
What are the basic uses of transformers?
Creating electrical references, changing electrical values to a practical level to be measured, and enabling efficient power transmission
Transmission line has a flow of 400 MW, 300 MVAR. The thermal limit of the line is 600 MVA. Assuming the line voltage is 352 kV, what is the MVA loading on the line and there's a line within its thermal limits?
Yes, 500 MVA
Studies have indicated that for a voltage reduction of 5% non-motor load magnitude will, on average, decreased by what percentage?
10%
A transmission path as a short term thermal limit of 1000 MVA, a long term limit of 900 NBA, a voltage stability related transfer limit of 1050 MVA, and an angle stability related transfer limit of 1100 MVA. What is the transmission pass short term operating?
1000 MVA
A transmission operator she'll have responsibility and clear decision making authority to?
Alleviate operating emergencies
A contingency results in the exceedance of an IROL. What could be the result if the IROL is allowed to be exceeded longer than Tv?
Interruption of power to a large part of the BES
Frequency shows a disturbance then from point B to point C we see a slight increase. What could be happening?
Automatic governor response (AGR)
A generator delivers its power to a multi line transmission system. Of the multiple lines connected to the generator bus, line X absorbs 25% of the generator output is line X as a transfer limit of 200 MW what is the maximum output of the generator?
800 MW .25/200 = 1/x cross multiply
Each balancing authority and transmission operator shall coordinate it's seasonal planning and operations with?
Neighboring BA, TOP, and RC
When an IROL or SOL violation occurs,________are responsible for responding to the IROL and SOL violations.
The transmission operators contributing to the violations and those affected by the violation
What type of HVDC system has two conductors, one energized with a positive voltage and one with a negative voltage?
Bipolar
Which of the following would be an example of "supplementary excitation control"equipment?
Power system stabilizer
The mega white loading on a transmission line is at the point where the natural MVAR production of the line matches the lines MVAR usage. This MW loading point is called the?
Serge impedance loading (SIL)
Load increases or decreases according to the increase or decrease in frequency. For every 1% change in frequency, load will change approximately_________percent in the same direction.
2
A transmission line conductor is rated at 180 MVA, the line side current transformer is rated at 160 MVA and the bus is rated at 200 MVA. What is the MVA limit for the transmission line?
160 MVA
If frequency, voltage, and phase angle difference are too large to permit breaker closing, a system operator should first consider?
Re-dispatching generation
Station A bus is connected to station B bus by 230 kV transmission line. All stations have 100 MVAR shunt capacitor bank off-line. The SOL on this line is 350 MVA. The system operator is made aware that the line flows are 345 MW from station A to station B and 100 MVAR From station B to station A. The system operator should return the transmission line to its operating limit by?
Placing the capacitor bank online at Station A.A good way to think of this is that which ever direction is absorbing or taking in MVAR will need to be turned on.
During extreme low load conditions, what are the primary system conditions a system operator typically works to alleviate?
High-voltage and over generation
Which of the following actions is used to prevent a voltage collapse due to a reactive power deficiency?
Implement load reduction
A reactor is rated at 100 MVAR nominal and is operating at a voltage of 90% how many MVAR is it absorbing from the system?
(V actual/V nominal) ^2 ) x MVAR 81 MVAR
Reactive resources are used to
Maintain acceptable voltage levels
When I system is on the verge of voltage collapse and nothing else can be done to alleviate the problem operating personnel should?
Shed Firm load
To be effective, reactive resources should be?
Located close to load areas
If the line is loaded above it's SIL, how does that affect the line and the voltage?
The line becomes more inductive and the voltage drops
If the line is below it SIL, how does that affect the line voltage?
The line becomes more capacitive and the voltage raises.
The value of MVAR,MW,MVA,Ampere,Hz, and volts that satisfies the most limiting of the prescribed operating criteria for a specified system configuration to ensure operation within acceptable reliability criteria is called?
System Operating Limit (SOL)
A system operator is attempting to synchronize two systems together in preparation of supplying customer load. The synchroscope it not moving. A system operator should first?
Adjust generation to verify the synchroscope is working
Which condition is likely to lead to potential voltage collapse
Insufficient dynamic reactive resources
Several SCADA Alarms indicate a disturbance in area B. They are for transmission lines connecting area A the area B which have become heavily loaded due to the disturbance. One of the lines above it's SOL. Reid dispatching of generation has no effect on line flows. As the operator, which answer best applies to the situation?
There is a possible separation or island in an area B
When reactive resources are woefully inadequate to meet reactive power demand, A likely ultimate outcome is:
Voltage collapse and separation of the system
Why is location of transmission system reactive power reserves important?
Reactive power is difficult to transmit through high impedance
Of the following reactive Reserve sources, which would fall into the static reactive reserve category
Static VAR compensator in automatic mode
Of the following reactive reserve possibilities, which could be counted as dynamic reactive reserve from rotating source?
Generator in automatic voltage regulation
Following a contingency or other even that results in an IROL violation, the appropriate TOP shall return it transmission system to within limits as soon as possible but no longer than:
30 min
Under what circumstances can low voltage occur without an initiating event?
When reactive resources are deficient
Inadvertent Interchange accumulations may be paid back by one or both of the following methods?
Unilateral and or bilateral.
The entity which has the highest level of authority for reliable operation of the BES, and has a wide-area and operating tools, processes and procedures to prevent or mitigate emergency operating situations is the:
Reliability Coordinator
The net scheduled transfer between two BAs areas?
May not exceed the thermal, stability capacity limits of any available, utilized transmission facility or line used in the transaction. May not exceed the total transfer capability between any of the areas
A 800 MW generator is synchronized and loaded at 650 MW. The generator can ramp at 5 MW min. What is the amount of spinning reserve presently available on the unit?
75 MW
How often must a BA and Reserve Sharing Group review their probable contingencies to determine their prospective MSSC?
Annually
A radial transmission line feeding load is overloaded. The TOP must do which of the following to unload the line?
Shed Load at the end of the line
A BA's ACE is 0 as long as which of the following is maintained?
The balance between actual and scheduled interchange plus the proper contribution to interconnection frequency regulation
Which of the following devices primary purpose is to assist withe the damping of power system oscillations?
Power system Stabilizer
Generators have the ability to be used as voltage control devices. If a generator raises its VAR output, the system operator should expect the system voltage to?
Increase
Each BA must have which of the following metering installed on their tie-line with other BAs?
MW and MWh
Given normal operation conditions, why should AGC equipment remain in service?
To regulate ties
Two or more BAs can join a RSG. Which of the following is a responsibility of an RSG?
Comply with the DCS as if it were a single BA
If an Interchange Transaction is implemented to replace an unexpected generation Loss, no Tag is required if the Interchange Transaction lasts less than?
60 min
Assume a TLR procedure has been implemented and Interchange Transactions have been curtailed. Assume further that the Operating Security Limits violation has been removed and some Interchange Transactions can be resumed. Which Interchange Transactions should if possible be re-established?
Those with the highest Transmission Service Priority
BA A sells 100 MW to another BA. The ramp begins at the top of the hour and is ramped for 10 min. How much energy is actually transferred within the first clock hour?
92 MWh
Operating authorities have the responsibility and the authority to take actions necessary to ensure reliable system operation within their operating areas. This could include all except which of the following?
Selling power to purchasers will to pay higher than current bid price
Which of the following will contribute favorably to a BA's CPS1 score?
A negative ACE when frequency is above schedule
A 230/115 kV transformer is rated at 100 MVA and has 80 MW entering the primary side. What would you expect the real power output to be on the secondary side?
80 MW
Several SCADA alarms indicate a disturbance in area B. There are four transmission lines connecting area A to area B which have become heavily loaded due to the disturbance. One of the lines is above SOL. Re-dispatching of generation has no effect on the line flows. As the operator, which answer best applies to this situation?
There is a possible separation or islanding in area B
Of the following reactive reserve sources, which would fall into the static reactive reserve category?
Static VAR compensator in automatic mode
The complete interchange Transaction Tag must be provided to all of the following except?
NERC RE personal
Can a synchronous machine have a negative torque angle? What does this mean?
Yes, the machine is absorbing active power
A pseudo-tie is entered into what proportion of a BAs tie-line ACE equation?
Actual Interchange
Assume a 345/115 kV auto-transformer has NLTC on its high side winding with a range of +/- 5%. If the NLTC is initially at its neutral position, what would happen to the low side voltage if the high side tap were reduced by 5?
Rise by 5%
Which BA is responsible for initiating the implementation of each Interchange Transaction as tagged?
The Sink BA
The Source BA and Sink BA shall evaluate information for Arranged Interchange. Which data must be included in that assessment?
Energy Profile, Ramp and Schedule Path
Voltage is high in an area due to off-peak demand. There are several lightly loaded high voltage transmission lines going to radial loads. All capacitor banks are out of service. Generators still have reactive reserves both leading and lagging. What should be done first to lower the voltage?
Use generators to absorb VARs
A BA with a bias setting of -200MW/0.1Hz changed NIs by +40MW as their part of a time error correction. The BA system operator decides instead of changing their NIs they will change their Fs value. The Fs value would be what?
60.02 Hz
Unless agreed to by all involved Ba, the normal ramp duration for an interchange Schedule between the Eastern and TRE Interconnections is?
10 min
All involved Ba, the normal ramp duration for an interchange Schedule between the Western and TRE Interconnections is?
20 min
A certain dynamic schedule is tagged for an average flow of 100 MW. By what minimum amount would this schedule have to change before the Tag must be updated?
26 MW
If in the course of operations during emergency conditions it becomes necessary to implement a voltage reduction, where should the voltage reduction take place?
On the distribution system
A system operator is about to synchronize two islander power systems, which of the following is not a variable which must be controlled?
Power Angle
Which type of special operation procedure is implemented to relieve an overloaded transmission path?
Transmission Line-Loading Relief Procedure
A 0.3 Hz drop occurs, causing a 500 MW generator to increase its output from 400 MW to 450 MW. What is the % droop of this generator?
5%
The primary purpose of an UFLS program is to
Arrest the frequency decline e
Electric Utilities shall report losses of large amounts of firm system loads to:
DOE
Frequency Droop in Hz/Max Generation
Change in Frequency/ Change in Actual Output
An UFLS load shedding plan would be deemed ineffective if the system was:
Over-Frequency combined with loss of load
NERC Standard EOP-011 sets forth general requirements for emergency operations. What are the two categories of emergency?
Capacity and Energy
What should the primary objective be od a BA during a capacity or energy emergency?
Return ACE to an acceptable level
You are doing a perfect job of maintaining a load-resource balance. Suddenly a large generator in another BA trips off Hz drops to 59.9 Hz. Your frequency bias is -50 MW/0.1 Hz. If your bias is set correctly, your ACE should be:
0MW
Each BA shall agree with Adjacent BA that their Composite Confirmed Interchanges are:
Identical in magnitude and opposite in sign
A portion of a RC is experiencing low voltage. What directives should the RC give?
Lower transfer across the area and decrease generation.
A study shows that a single contingency would result in an IROL violation and the corrective action would require opening a breaker with no SCADA control due to a failed RTU. What should the system operator do first?
Dispatch field personnel to the breaker's substation
Your system is in the process of recovering from an 8 hour blackout during extreme cold weather. A "controlled operation" switching strategy would preferred in this case over the "all open" approach due to which of the following reasons?
TO minimize battery power depletion
Each TOP, TO, and DOP shall provide________ hours of system restoration training every ______________ calendar years to their field switching personnel identified as performing unique tasks associated with the TOPs restoration plan that are outside of their normal tasks.
2 hours, 2 calendar years
During a system restoration, a system operator is receiving high MVAR and MVA alarms from the 345 kV system. What is the best way to bring the system back to an acceptable condition?
Energize shunt reactors
Assume you are TOP. Further assume that you have both manually controlled shunt capacitors and automatically controlled generator MVAR available to use. Which type of MVAR resource would you utilize first and why?
Shunt capacitors to increase generator dynamic reactive reserve
A power system has ten units on AGC. The units have different capacities and droop settings. The biggest adjustments in MW output in response to frequency disturbance will be provided by units that have?
Large capacity and small droop setting
You are a BA, you anticipate a capacity shortage as your system moves into the days peak load hours. You should immediately?
Inform all affected systems
During operating emergencies, plans should be in place to ensure adequate supplies of fuel, including:
Optimize the operation of generating plants, do fuel switching at plants where shortages may occur, request exemptions from environmental constraints
A 500 MW generator trips in a BA to external to your BA. Which of the following responses would you expect to see in your Area?
Positive Net Actual Interchange deviation
There are several AGC modes available to most BA. A BA that is operating asynchronously should switch its AGC mode to?
Flat Frequency mode
Real-Time Tags for interchange transactions of less than an hour from Ramp start time must be submitted?
10 min
Real-Time Tags for interchange transactions 1-4 hours from Ramp start time must be submitted?
20 min
Real-Time Tags for interchange transactions 4 hours + from Ramp start time must be submitted?
120 min 2 hrs
Your system load is 4000 MW. An event report to NERC is required if you shed load how many MWs to maintain continuity of the BES?
> 100 MW
The transmission path used to connect a black start resource to the next generator to start is called
Cranking path
If a BA does not meet the DCS during a given quarter, what category of reserve must be increased for the subsequent quarter?
Contingency Reserve
Which type of protection relay utilizes CTs to ensure a normal conditions balance between current inflow and outflow?
Differential
Of the following possibilities which is a GMD most likely to cause?
Transformer Overheating
A ___________ tool is used to ensure the power system can respond within acceptable limits N-1 conditions
Contingency Analysis
Which factor accounts for the amount of transfer capability reserved by an Load Serving Entity to ensure access to generation from the interconnection systems to meat generation reliability requirements?
Capacity benefit Margin CBM
Assume EEA 3 is declared & the deficient BA is in need of additional ATC. From the allocations could the RC seek to obtain the ATC?
Capacity Benefit Margin
Assume you are monitoring ACE and frequency as the peak load hour approaches. Frequency is gradually decreasing and then your net actual interchange swings from out to in. Frequency and NIa then become erratic. Frequency is oscillating about its 60 Hz target. This combination of event best indicates
Instability within the power system
In an islanded or isolated condition, typically the first thing you would do is?
Determine the extent and condition of the isolated area
Which BA is responsible for implementation of each Interchange Transaction as Tagged?
Sink BA
A major TO line has been scheduled out for maintenance. Other outages have occurred and the load will be greater than originally expected. The system operator should:
Preform a load flow study prior to allowing the previously scheduled
Cold load pick up can involve current flows of up to what maximum levels?
10 or more times normal
Two methods NERC recommends be used to verify a systems power system restoration plan:
Actual testing in the power system, Simulation testing with computer models.
During which level of an EEA is the deficient entity for which the RC initiated the EEA first called an Energy Deficient Entity?
2
A system operator is conducting switching operations. When you open one end there is an indication of loss loss. What should you do?
Suspend the switching operation and verify indications
Which of the following is a common method used to compensate bilaterally inadvertent interchange?
Compensating energy flow during the appropriate on-peak off-peak hours
Which of the following is a common method used to compensate unilaterally inadvertent interchange?
Adjusting the AGC to off-set the ACE zero and consequently supply or draw more energy from the interconnection
The purpose of a series capacitor is best described by which of the following statements?
Decrease the impedance and boots power transfer capability
A transmission service provider has studied their system and determined that its ATC is 1000MW from A to B. Assume that this Transmission Service Provider sells 500 MW of this ATC as non Firm. No other ATC is sold. What amount of firm ATC does this transmission service provider have from area A to B after this 500 MW non-firm sale is completed?
1000MW
Each BA and TOP shall coordinate its seasonal planning and operations with?
Neighbouring BA's, Neighboring TOPs, RC
If an interchange transaction is implemented to replace an unexpected generation loss, no Tag is required if the interchange Transaction lasts less than?
60 min
BA A has four interchange schedules active for the hour beginning 10am. Schedule 1 of 60 is in from BA B 2 of 100 is in from BA C 3 of 50 is out of BA D 4 of 100 is out of BA E
Assume that a generator in BA B trips at 10:33am. The BA B system operator notifies the BA A system operator or of the unit at 10:38 am BA A and B agree to cut their schedule of 60 MW at 10:45.
What is the net integrated schedule of BA A for the hour beginning at 10 am and ending at 11.
+5 mW
Transaction tags must contain certain types of information, including but not limited to the following?
Physical path, Transmission Service Provider,POR/POD, Energy profile energy to be produced by the generator for east time segment of the Transaction, Transmission reservation number
Each BA shall agree withe the Adjacent BA that their Composite Confirmed Interchange are:
Identical in magnitude, opposite in sign
Why is location of transmission reactive resource reserves important?
Reactive power is difficult to transmit through high Impedance
BA A has the following schedules implemented. What is the BAs' NIs and are they an exporting or an importing BA?
Import BA B 100MW
Import BA C 200 MW
Export BA D 800 MW
500 export
A certain dynamic schedule is tagged for an average flow of 100 MW. By what min amount would this schedule have to change before the tag must be updated?
26 MW
If a capacitor bank is removed from service, what is the immediate effect will there be on the voltage?
Decrease
If system frequency were to run at 60.02 Hz for two hours how much positive time error would occur?
2.4 seconds
The Interconnection frequency suddenly drops from 60Hz to 59.94Hz while your BA ACE is zero. The Low frequency condition exists 15 min later. Assuming you have the following options which would you take?
Make known your ability to provide emergency assistance: Act bilaterally to raise frequency
What percentage of Contingency Reserve does NERC require be the frequency responsive type of Spinning Reserve?
NO requirement
There are several AGC modes available to most BA. A BA that is operating asynchronously should switch its AGC mode to
Flat Frequency Control (Constant)
Overlapping regulation service is a method of providing_________________- in which the providing BA incorporates all of the other BA tie-lines frequency response, and schedules into its own AGC/ACE equation.
Regulation Service
BA A has 10 generators total capacity of 1500MW 5 have the capacity of 100 MW and 5 are at 200 MW. Generator at 180 MW loaded trips off. Is this a DCS event and if so how long does the BA have to return ACE to DCS limits?
yes, 15 min
The initial response to a frequency deviation is due to which of the following:
Load/Frequency response/Governor Action
When generation or transmission equipment must be removed from service the GOP BA and TOP must:
Coordinate with the RC, Ensure the reliability impact of the outage is evaluated
A dynamic schedule is tagged for 25 MW. By what min % amount would this flow have to change to change before the Tag must be updated?
More than 100%
When energizing transmission lines during power system reconstruction which of the following factors do you most need to consider?
Natural Capacitance
When attempting to synchronize two Islands with different Hz it is normally advisable to:
Direct the smaller island to change speed
How long would it take for a 60Hz voltage wave to complete 1/4 of its cycle?
1/240
To avoid a high over voltage at the open end of a transmission line the switching sequence is arranged so that some load is attached to the otherwise open-end Which type of load would best reduce this Ferranti over voltage?
Lagging Power factor load
A TOP restoration plan must describe the restoration of the power system up to the point at which
The next load to be restored is done for the sake of the customer
A BA is experiencing low voltage in the northeast region. A 50 MVA generator in that area is loaded at 50 MWs. What action could a System Operator take to increase the voltage in that area?
Decrease real power and increase reactive power
In the initial stage of a restoration condition high transmission system voltage problems are more likely than low transmission system voltage problems
Excessive MVAR supply from the energization of the transmission lines
A system operator has exhausted all available resources and re-dispatched options. System voltage continues to decline. What should the system operator do next?
Shed load in the low voltage area
A GDM is predicted to occur tomorrow which parts of the system are most likely to experience problems
Wye connected transformers
During the initial stages of the system restoration process, load pick-ups should be limited to ____________ of the total synchronized generation.
5%
________will be sold as a non-firm transmission product during EEA2
Capacity Benefit Margin
A thermal generator has an emergency power source. Which two items below would typically powered from this emergency power source?
Turning Gear, Lube oil Pump
Interconnection Hz is at 59.15Hz. The system Operator has not experienced any disturbances. What could this indicate?
Interconnection system loads are higher than on-line generation
As a general rule of thumb a 5% reduction in customer voltage will lead to what level of reduction in load magnitude?
3%
Which of the following is used to help balance a system after it separates from the Interconnection during a disturbance?
Automatic UFLS
After a disturbance on the system, a BA re-dispatches generation in an attempt to reduce loading on a transmission line. The re-dispatch has no effect on the line. What action should the system operator take?
Re-evaluate boundaries
Emergency assistance for a capacity deficiency shall be scheduled by the BA
With as much advance notice as possible
Damage or destruction of a Facility that results from actual suspected human action shall be reported to
The Electric Reliability Organization and other organizations
Each RC, TOP and BA shall notify entities the communication with of a failure of its Interpersonal Communications capability if it last longer than?
30 Min
If alternative Communications are found to be unavailable during routine testing the responsible entity must repair or designate a replacement within?
2 hours
RC will have interpersonal communications with all of the following accept?
GOP
Operating personal who issue burst Operating Instructions shall confirm that the Operating Instruction was received by
At least one receiver of the Operating Instruction
Scheduled outage of tie-line telemetry and supervisory control for the tie-line substation brewer shall be coordinated between whom?
The affected BAs and TOPs
Which of the following is a disadvantage of microwave systems?
Radiated beam can be scattered by fog
Microwave telecommunications is often employed for data, voice & control capabilities. The transmission media in microwave telecommunications systems are:
Air
Assume a system operator issues an operating instruction to a substation operator. The substation operator repeats back the operating instruction with an error. The operator shall?
Repeat the original statement to resolve the misunderstanding
Transmission lines are protected by the transfer trip, carrier, and other types of pilot relay schemes. Pilot relay schemes are necessary for what reason?
Pilot relays allow instantaneous tripping for faults within 10%-20% of the line distance from the remote terminal with primary protection
While adjusting the tap changer on a large power transformer's protective relay's operate. The most likely relay to operate would be?
Differential
Load rejection schemes are a form of Remedial Action Schemes RAS. In a load rejection scheme, the term load refers to the:
Generator MW output
The purpose of the CT and PT is to ________________ the high voltage power source to the low voltage relays.
Step down
High speed transmission protection is a benefit to angle stability because:
Fault duration is reduced, accelerating time is reduced, angle spread is reduced
What type of relay uses a combination of CT measurements and PT measurements and operates when the ration of the PT measurements to CT measurements is below a certain limit for a given period of time?
Distance Relay [Show Less]