PJM Generation Operation Exam - Questions and Answers Control center facilities must have a minimum of how many days of fuel for the backup generator? 5
... [Show More] days If PJM ACE shows overgeneration, actual imports are: Less than scheduled Who should a generator contact at PJM to clear an outage ticket? Master Coordinator To correct for a slow or fast clock, system frequency schedules are offset by: +/-.02 Hz What frequency would PJM set to correct for fast-time error? 59.98Hz What frequency would PJM set to correct for slow-time error? 60.02Hz What info is on an instantaneous reserve check? synchronized (regulating and non-regulating), quick start, secondary and beyond secondary reserves Generators must provide PJM with a realistic Reactive Capability Curve. This curve must have no less than __ points, and no more than __ points. No less than 2 and no more than 8 points A classic indicator of voltage instability is when system voltages change greatly when... system loads change by a small amount Above the line of a D-curve... Lagging (pushing VARs). Generators will be set there during high-load/low voltage conditions. Below the line of a D-curve... Leading (absorbing VARs). Generators will be set there during low load/high voltage conditions. MWs and MVARs have what kind of relationship? Inverse (increase in MW = decrease in MVARs) How often do generators need to test reactive power capability? Every 5 years The computer hardware and software at each control center shall achieve an availability level of what for those reliability functions directly affect the successful operation of PJM? 99.95% What is EHV? Extra high voltage. Classified as 345kv and above Any generator that is a PJM generation capacity resource that has an RPM Resource Commitment: 1. Must submit an offer schedule into the DA market even if it is self-scheduled or unavailable due to outage 2. Generation capacity resources shall submit: -A schedule of availability for the next seven days -May submit non-binding offer prices for the days beyond the next Operating Day What time period is the Market Participant Bid/Offer Period? 0800-1100 What time are DA Market results posted? 1330 What time period is the re-bid period? 1330-1415 What is the maximum for a generation capacity resource offer? $2000/MWh [Show Less]