CPI exam 35 Questions and Answers Latest
Transportation - Correct AnswersWaste caused by unnecessary movement of material or
... [Show More] product
Inventory(excess) - Correct AnswersWaste of materials, parts and assembled goods when produced or purchased in advance of customer requirements
Motion - Correct AnswersWaste caused by non-value added movement of workers and/or production machines
Waiting - Correct Answersthis waste occurs whenever material, information, people, or equipment is not ready
Over production - Correct Answerswaste caused by producing more than the customer needs (push). this type of waste leads to excessive inventories
Over processing - Correct AnswersThe waste of unnessecary or non optimized process and/or operations
Defects - Correct AnswersWaste that occurs when a process, prodct or data does not conform to proper specifications. The result could cause product rework, scrap, or the escape of a defect to the customer
Under utilization of people - Correct Answerswaste of a person's time and talent
-Overproduction
-Waiting time
-Transportation
-Over-processing
-Inventory(excess)
-Motion
-defects
-Non-utilization of people8 - Correct Answers8 Forms of Waste(TIM WOOD U)
Main objective of theory of constraint - Correct AnswersRestructure the organization around the main objective ( seeks to identify bottle necks in the system)
Lean - Correct AnswersSeeks to indentify and reduce waste in the value stream. Systematic approach to identifying and eliminating waste
5s - Correct AnswersSort, simplify, systematically clean/sweep,standarize
Standard work - Correct AnswersDocumented way of reduing variation and preventing backsliding
Purpose of six sigma - Correct AnswersReduce/ remove variation from a process
Time to reliably replenish - Correct AnswersTRR
1. department wide
2. divisional - Correct Answerstwo types of technical training
1. 1 x month
2. SMD coordinates
3. CPI subject must be 1 x quarterly
4. doesn't have to be supply related - Correct AnswersDepartment wide training
1. 3 x month
2. OIC must validate plan and sign prior to training
3. Supply related - Correct AnswersDivisional training
App X - Correct Answerswhat Appendix is technical training on?
Inventory Management Performance Report - Correct AnswersIMPR
IMPR - Correct AnswersDetailed report with specific numbers of monthly goals and performance indicators indicative of the supply department efficiency
Line graph - Correct Answersused to compare over time and track trends
Column graph - Correct AnswersUsed to compare two or more values, such as AK0 and AK7. Also stacked grapghs can be utilized to show different group data such as AK0 vise AK7 or hi pri and low pri
Pie chart - Correct AnswersDivided into sectors. Each sector represents a portion of the whole. This can highlight a negative or positive aspect
Scatter plot chart - Correct AnswersShow how much one variable is affected by another. The relationship between two variables is called their correlation
Histogram - Correct AnswersDivided into classes or groups and is used to show frequency of occurrences on a continuous line
Issues - Correct AnswersType 12
NIS - Correct Answerstype 13
NC - Correct Answerstype 14
1. Poor inventory validity/ management
2. Slow order process
3. Lack of system availability
4. Insuffient RO
5. Demand spike - Correct AnswersCommon Cause: NIS PSLID
1. First time demand
2. Demand pattern below levels
3. Demand occurred between levels
4. Missed levels - Correct AnswersCommon Cause: NC FDDM
>= 65% - Correct AnswersGross eff %
>= 85% - Correct AnswersNet eff%
(dr-cr) Clmn 6/ (dr-cr) clmm 2 - Correct AnswersGross % formula
(dr-cr) clmm 6/ (dr-cr) clmm 5 - Correct AnswersNet % formula [Show Less]