BUS 430 Management Quiz 2021 – 100% Score
User USER 1
Course Test Started
Operations Management Quiz Chapters 8 & 9 11/12/21
Submitted
... [Show More] 11:48AM
Due Date 11/15/21 9:00AM
Status Completed
Attempt 40 out of 40 points Score
Time 1 hour, 13 minutes out of 2 hours Elapsed
Instructions This quiz consists of 30 multiple-choice questions. The first 10 questions cover the material
in Chapter 8. The second 20 questions cover the material in Chapter 9. Be sure you are in the correct Chapter when you take the quiz.
Results SubmittedAnswers, CorrectAnswers, Feedback Displayed
Question 1 2 out of 2 points
An assembly line with 28 operations is to be balanced. The total amount of time required for all 28 operations is 39 minutes. The longest operation takes 2.2 minutes and the shortest takes 0.8 minutes. The line will operate for 450 minutes per day.
1. Determine the minimum and maximum cycle time.
2. What is the output rate if the cycle time is set at 2.2 minutes?
SelectedAnswer:
min cycle time = 0.8; max cycle time = 39; output rate = 204.5
CorrectAnswer:
,e; min cycle time = 0.8; max cycle time = 39; output rate = 204.5
Question 2 2 out of 2 points
is vertical expansion of job duties to give the worker more responsibility. SelectedAnswer: & Job enrichment
CorrectAnswer: e, Job enrichment
A WEEK 6 > USER1 53 ...,
Question 3 2 out of 2 points
Which one of the following fits best with process layout? Selected Answer:
0 Skilled workers
Correct Answer:
& Skilled workers
Question 4 2 out of 2 points
A layout is an arrangement based on the sequence of operations that are performed during the manufacturing of a good or the delivery of a service.
Selected Answer:
e, Product
Correct Answer:
e, Product
Question 5 2 out of 2 points
The determination of specific job tasks and responsibilities is called . Selected Answer:
& Job design
Correct Answer:
e, Job design
Question 6 2 out of 2 points
For a given cycle time in line balancing, assembly-line efficiency can be increased by Selected Answer: [Show Less]