P-100 designed for - Answer- Firefighting and dewatering
Discharge fire hose electrical submersible pump size - Answer- 2 1/2"
Portable eductors
... [Show More] operated by - Answer- Firemain pressure
Submersible pump handling line length - Answer- 50 feet
Portable submersible electric pump water height to pump - Answer- 6 inches
Peri-jet has how many jets around the vacuum chamber - Answer- 6
Hole 18" square and 6" deep needs what patch - Answer- Metal box
Marlin on soft patch starts from where - Answer- The center
Soft patch material location - Answer- Pipe patching kit
Type of hook bolts used in plugging and patching - Answer- T,L,J
All are patches except - Answer- K-type
Soft patch psig max system - Answer- 100 psig
Purpose of patching as related to flood damage - Answer- Minimize flood damage
The EWARP can hold up to 150 psig at how many degrees - Answer- 300 degrees F
EWARP applied to piping systems how many inches in diameter - Answer- 2 1/2"
Max time a fitting can remain open - Answer- 24 hours
Person cleared routes and allows access to fires - Answer- Access man
True/false extra plugging and patching repair kits are inventoried and maintained by personnel assigned to the engineering space - Answer- True
4 vital principles of investigation - Answer- Thorough,cautious,report,repeat
Refer to what to find bulkhead terminal location - Answer- Casualty power system diagram
Firemain/piping system rupture indication - Answer- "R"
Eye protection not required for - Answer- Normal operation of lube oil system
Single hearing protection requirement - Answer- 84 DB
Dial indicator use - Answer- Align machinery
Fitting needs co permission - Answer- Circle zebra
Fitting open regardless of material condition - Answer- Williams
Fitting to stop light exiting ship - Answer- Dog zebra
4-175-4-E what does 175 stand for - Answer- Fed most frame
Fitting secured for CBR Defence - Answer- Circle Williams
Ships in no danger - Answer- X-ray
Ships backbone - Answer- Keel
Compartments on starboard side are - Answer- Odd
Bulls eye lettering length - Answer- 2"
Primary firemain system monitoring - Answer- DCC
Firemain near centerline extending fwd and aft on damage control deck - Answer- Single main
Procedure to align installed educator for operation - Answer- Discharge valve, firemain actuation valve, beige suction valve
Drainage system that runs through machinery spaces - Answer- Main
True/false to prevent possible flooding bilges remain closed - Answer- True
True/false crash and salvage handles all damage caused by collisions - Answer- False
DCC is lost so who is backup - Answer- Most remote repair locker
True/false dc repair station re-man mainspaces is repair 5 - Answer- True
Main deck repair party - Answer- 1
Dc party only on air capable ships? - Answer- Crash and salvage team
I exploded munitions location - Answer- CBR monitoring
Freeboard is a measurement of distance from - Answer- Waterline to weatherdeck edge
How many gallons when sounding tape reads 32 feet - Answer- 10056.96
True/false investigators must use message blanks to write damage - Answer- True
How to check door for heat - Answer- Hold hand 1/2 inch away from door
X50j circuit is what circuit - Answer- Fog foam
X40j circuit is what circuit - Answer- Casualty communications
Quantity of rapid plotting message blanks - Answer- 5
Holds PECU rod in torch assembly - Answer- Nut and chock
Secured single lever/handwheel - Answer- Quick acting watertight doors
Maintenance requirement of all equipment in a command - Answer- Pms masterfile
Cleaning gasket material on watertight doors - Answer- Block of hardwood
Storage hazardous material r [Show Less]