What is the definition of "operator"? - CORRECT ANSWER-Operator has the same
meaning as certified operator.
Within how many days must a certified
... [Show More] operator notify the Department (in writing) that
the operator either ceases or commences operation of another facility? - CORRECT
ANSWER-10 days
At which type of facility is a remote operator allowed to operate? - CORRECT
ANSWER-Any Grade 1 or Grade 2 facility
How close must the remote operator of a facility be to the facility to legally operate the
facility? - CORRECT ANSWER-Within 200 miles by ground travel.
What is the inspection frequency that a remote operator must inspect a grade 1 or
grade 2 water treatment plant or distribution system that produces groundwater? -
CORRECT ANSWER-As often as necessary, but no less than monthly.
Upon expiration of an operator certificate, how many days does an operator have to
reinstate the certificate without retaking an examination? - CORRECT ANSWER-90
days
What is an initial monitoring year? - CORRECT ANSWER-The calendar year
designated by the Department within a compliance period in which a public water
system conducts initial monitoring at a point of entry.
What is the reporting limit for all regulated VOC's? - CORRECT ANSWER-0.0005 mg/L
Who is allowed to conduct a sanitary survey? - CORRECT ANSWER-A representative
of the Department or a professional engineer or sanitarian who is registered in Arizona
and approved by the Department.
Under what circumstances may the Department reduce monitoring frequency for nitrate
at a surface water sampling point and what is the reduced frequency? - CORRECT
ANSWER-If the analytical results are < 5 mg/L for 4 consecutive quarters then reduce
sampling frequency from quarterly to annually.
Which type of system is not required to sample for VOC's? - CORRECT ANSWERTransient Non-community Water System.
What contaminants does the monitoring assistance program monitor? - CORRECT
ANSWER-IOCs, VOCs, and SOCs.
What types of public water system must comply with Article 6, Capacity Development
Requirements for a New Public Water System? - CORRECT ANSWER-Community
water systems and non-transient non-community water systems that begin operations
on or after October 1, 1999
To become a new public water system, an owner shall file an elementary business plan
for review and approval by the Department. What three elements make up the
elementary business plan? - CORRECT ANSWER-Technical Capacity, Managerial
Capacity, and Financial Capacity.
What is the definition of an "on-site representative"? - CORRECT ANSWER-On-site
representative means a person located at a facility who monitors the daily operation at
the facility and maintains contact with the remote operator regarding the facility.
According to Arizona State Rule, an "Air-gap separation" means a physical separation
between the discharge end of a supply pipe and the top rim of its receiving vessel,
which has a separation distance equal to at least? - CORRECT ANSWER-1 inch or
twice the diameter of the supply pipe, whichever is greater.
According to Arizona State Rule, this term means 1 of the family of organic compounds,
named as derivatives of methane, wherein 3 of 4 hydrogen atoms in methane are
substituted by a halogen atom in the molecular structure? - CORRECT ANSWERTrihalomethanes
According to Arizona State Rule, what term best represents a mechanical device use [Show Less]