Traffic Supervisor Practice And Complete Solution2024
Is a shadow vehicle used in all traffic zones?
A. True
B. False - answers False
The shadow
... [Show More] vehicle is occupied whenever workers are in the work area.
A. True
B. False - answers False
What class one light is the shadow vehicle equipped with?
A. Flashing Yellow Light
B. Oscillating Yellow Light
C. Yellow Strobe Light
D. All of the above - answers All of the above
When may cones be substituted for drums?
A. Daytime traffic control minimum height 18"
B. Daytime traffic control minimum height 28"
C. Daytime traffic control minimum height 36"
D. Daytime traffic control minimum height 42" - answers Daytime traffic control
minimum height 28"
When may cones be substituted for drums?
A. Daytime traffic control minimum height 18"
B. Daytime traffic control minimum height 28"
C. Daytime traffic control minimum height 36"
D. Daytime traffic control minimum height 42" - answers Daytime traffic control
minimum height 28"
When cones are substituted for drums for nighttime closers, what is the minimum cone
height requirement?
A. 18"
B. 28"
C. 36"
D. 42" - answers 42"
When cones are substituted for drums at nighttime closer, what is the maximum cone
spacing?
A. 20'
B. 30'
C. 40'
D. 50' - answers 40'
What type of flashing warning lights are required when there is a nighttime lane closer?
A. ROAD WORK AHEAD
B. LANE CLOSED AHEAD
C. A & B
D. NONE OF THE ABOVE - answers ROAD WORK AHEAD
&
LANE CLOSED AHEAD
If there is a lane closure of greater than three days, what is required?
A. Work zone dotted lines, 4' in length separated by 10' gaps, shall be provided to
identify the merge.
B. The appropriate color work zone edge lines shall be applied along the taper and
tangent sections.
C. All the above
D. None of the above - answers The appropriate color work zone edge lines shall be
applied along the taper and tangent sections.
Work zone pavement marking that conflict with final traffic lanes shall be temporary
paint.
A. True
B. False - answers False
What are the extra advance warning signs?
A. Lane Close Ahead
B. Watch for Stopped Traffic
C. Road Work Ahead
D. All the above - answers Lane Change Ahead
&
Watch for Stopped Traffic
&
Road Work Ahead
Is the advisory speed plaque used in all traffic zones?
A. True
B. False - answers False
When the approach speed limit is 40 mph or less, 36" warning signs may be used.
A. True
B. False - answers True
Road Work Ahead signs shall be provided on entrance ramps or roadways entering the
work limits.
A. True
B. False - answers True
End Road Work signs are only required for lane closures of more than ______ day.
A. 1
B. 2
C. 3
D 4 - answers 1
Sign spacing should be adjusted to avoid conflict with existing signs, minimum spacing
to existing signs shall be 200' for speeds of 45 mph or less and a minimum of 400' for
speeds 50 mph or greater.
A. True
B. False - answers True
The minimum acceptable length for the merge taper shall be determined by _________
the width of the offset by the merge taper rate.
A. Subtracting
B. Adding
C. Divide
D. Multiplying - answers Multiplying
The tangent (recovery area) section between the two merge tapers should be 2 times
longer of the two merge tapers.
A. True
B. False - answers True
What is a fundamental principle of temporary traffic control?
A. To inconvenience motorists as much as possible so they will find another route.
B. To guide and direct motorists through or around the work area as efficiently as
possible. C. To make traffic move as slow as possible.
D. All of the above are fundamental principles. - answers To guide and direct motorists
through or around the work area as efficiently as possible.
What needs to be done when work is suspended for any length of time?
A. Take down the ROAD WORK AHEAD sign
B. Cover up the END ROAD WORK sign
C. Erect a WORK SUSPENDED sign
D. Cover or remove the FLAGGER AHEAD sign - answers Cover or remove the
FLAGGER AHEAD sign
What are the four zones of a work area?
A. Activity area, pedestrian area, termination area and equipment area.
B. Advance warning area, transition area, activity area and termination area.
C. Equipment area, termination area, activity area and transition area.
D. Transition area, advanced warning area, pedestrian area and buffer zone. - answers
Advance warning area, transition area, activity area and termination area.
Which of the following signs might you see in the advanced warning area?
A. END ROAD WORK
B. YIELD
C. EXIT OPEN [Show Less]