1. A "start transaction" is set to be the system's first screen displayed once you log in to GCSS-Army. Setting up a start transaction is ________ -
... [Show More] answerc. Performed on a daily basis
2. Core GCSS-Army transaction for Unit Supply are accessed from which of the following transaction codes? - answerb. ZUSMENU
3. Execution Management for ________ occurs at the Brigade SPO or equivalent while Materiel Management for ________ at the Sustainment Brigade or equivalent. - answerc. Plant 2000, Plant 2001
4. You have 18 stock SLocs for your UIC. What will you need to do first in order to add a new SLoc? - answerd. Contact the GCSS-Army Help Desk
5. Two serviceable telescopes mistakenly were reassigned to your CBRN SLoc. Which transaction code would you use to perform a transfer posting to move the telescopes to the COMMO SLoc? - answerb. MIGO
6. A Unit Supply Specialist in a TDA organization assigns unit property to a sub-hand receipt holder using __________. - answera. Equipment Packages
7. You create a purchase requisition for non-expendable material. You need to send the request to your PBO. How can you send the PR in a notification to the PBO? - answerb. From within the PR, select the SBWP Outlook icon, then click the attach PR button
8. You need to create a PR for a lateral transfer. Which transaction code will you use to create the PR? - answera. /n/ISDFPS/DISP_MAT_SIT
9. If you have 16 SLocs in your unit and the cyclic inventory has a material which you have issued to 8 different SHRs, that particular material will appear on a minimum of ________ inventory count sheets. - answerc. 8
10. You create a request for a Material Master for a non-standard non-expendable item in order to account for and manage the item within GCSS-Army. When is the Material Master created enabling the item to be requested, received, and issued? - answerb. After the PBO provides approval
11. General supplies are ordered by unit supply personnel using a Manual Reservation. After approval by release strategy managers, the next MRP run will convert the purchasing document to a Stock Transport Order (STO), a ________ series document number sent to the SSA for fulfillment. - answerd. 10xxxxxxxxxx
12. You want to designate a storage bin for a material in your Provisions SLoc. How often must this be done for a material number? - answerd. ONCE
13. When the MRP process runs, what kind of document will the system create when the demand quantity is greater than the on-hand quantity for the same material in the Provisions SLoc? - answerb. PR
14. Performing a PGR for an expendable or durable item will ________ - answerc. Increase the Provisions SLoc
15. A material is found on installation and does not have a corresponding STO/PO. How will you bring the material onto the Provisional SLoc? - answera. Transaction code MIGO with movement type 501
16. The Order Status Report (ZPROSTAT) allows you to display which of the following document types? - answerd. All of the above
17. Which of the following component replacements is available for issue to the PB01 work order? - answera. 002277356
18. The three-digit Supply Type Unit Code business-area identifier assigned to a DoDAAC/FEs Unit Supply - answerd. 950
19. You are using transaction code MD04 to view the effects of Material Requirements Planning (MRP). How much stock is available for issue in the below image - answera. 0
20. The available quantities in the MD04 report are according to which unit of measure? - answera. Or Which is an example of a historical challenge of STAMIS? - answerd. All of the Above
How many master servers does GCSS-Army have? - answera. 1
Which of the following is not a benefit of using GCSS-Army? - answera. Decreased asset visibility
What is the name of the National level ERP solution? - answerc. LMP
To mitigate risks and collect user feedback, development and delivery efforts have been divided into - answerb. Waves
Online functional learning portals are accessed through the - answerd. End User Manual - Plus
GCSS-Army will replace which of the following STAMIS systems? - answerd. All of the Above
Where and when does NET Core Instructor-Facilitated Training (IFT) occur? - answerb. On-site classrooms during full fielding
GCSS-Army is specifically configured to - answerc. Incorporate all of the business functions of the current STAMIS into one integrated system
What will Wave 1 replace? - answerb. Finance and SARSS dering
Notifications are sent to the PBO using which GCSS Army process - answer SBWP
The ______ provides commanders and managers at all levels, the primary tool for effectively managing fleet readiness by viewing the operational status of unit equipment - answer Equipment Situation Report
When you create a reservation for your SLoc, what document does the system create after the MRP process? - answer Purchase Requisition
Which of the following statements are true about the Total Asset Visibility Business Objects (BOBJ) report? - answer It is affected by pooled reporting and it derives information from the Mat comp (ZMATCOMP) report
When creating an OSI BOM for non-standard components, all the components must first have _____. - [Show Less]