In which of the project delivery phases is the team currently engaged?
A. Pre
... [Show More] construction
B. Design
C. Construction
D. Post construction
E. Pre design correct answer: e. Pre design
Identify the tasks they must accomplish during the predesign phase.
A. Assess the appropriateness of the site
B. Define building program
C. Identify governmental constraints
E. All of the above correct answer: e. All of the above
One of the most critical features of the design development phase of the building delivery process is?
A. Getting owner approval for the schematic design
B. Providing brief outline of specifications
C. Completing construction documents
D. Making decisions about pragmatic solutions for various building systems
E. None of the above correct answer: d. Making decisions about pragmatic solutions for various
building systems
Which of the following is not one of the required items of a set of construction drawings?
A. Plumbing riser plans
B. Electrical plans and sections
C. Digital walk throughs
D. Structural plans
E. Landscape site sections correct answer: c. Digital walk throughs
A specification is a written document that provides information about....of a given material as opposed
to the quantity.
A. Size
B. Shape
C. Scale
D. Quality correct answer: d. Quality
The csi master format is a standardized organizational system for specifications based on a
numbering system. An example of a specification number is: 06 10 00. The number 06 in the
example provided above refers to a specifications group called
A. A section
B. A component
C. A subsection
D. A division correct answer: d. A division
The divisions in the csi masterformat that architects are most concerned with are
A. 1-50
B. 2-14
C. 00-20
D. 2-50 correct answer: b. 2-14
The city of metropolis is seeking bids for fast-track construction of a new city hall building and parking
garage. The most likely way a contractor will be selected is through the
A. Design build method
B. Mulitple prime contractors
C. Invitational bidding method
D. Competitive bidding method
E. Negotiated contract method correct answer: b. Mulitple prime contractors
During the construction phase, the architect
A. Supervises construction on a daily basis
B. Is no longer needed on the project
C. Observes construction on a regular basis
D. Builds full size mock ups of some components of the building
E. Prepares record (as built) drawings correct answer: c. Observes construction on a regular basis
True/false
The project manual is composed entirely of specifications correct answer: true
Which of the following aspects of design and construction is not regulated by the building code?
A. Health and welfare
B. Structural safety
C. Aesthetic qualities
D. Life safety
E. Fire safety correct answer: c. Aesthetic qualities
The primary objective of a building code is to ensure that all new construction and renovations
provide an___level of safety
A. Maximum
B. Average
C. High
D. Low
E. Minimum correct answer: e. Minimum
Construction of a new building can begin only after
A. An application for a building permit has been approved and received by the owner
B.an application for a building permit has been submitted by the owner